Fish count for 15 points, not as a ground for exclusion: after nearly nine years of litigation, Ecowatt loses the battle over the hydropower plant on the Upper Scheldt at Asper
Ecowatt challenged the concession for a hydropower plant at the Asper weir because the tender of the temporary partnership Waterkracht Bovenschelde allegedly failed to protect fish migration adequately, but the Council of State holds that this protection was an award criterion, not a regularity requirement, and that the winner, leading 90 to 65, would still have ranked first even with a zero on the fish migration item (on which it scored 10 out of 15).
What happened?
On 15 September 2000 the Flemish Region published a call for candidates in the Bulletin der Aanbestedingen for a public works concession: the design, construction, financing and operation of a mini hydropower plant at the new weir to be built on the Upper Scheldt at Asper. Three candidates applied. Besix withdrew; on 19 December 2000 Ecowatt and the temporary association of West-Vlaamse Elektriciteitsmaatschappij, SPE and Vlaamse Milieuholding were selected. That association had applied as ‘Tijdelijke Vereniging Waterkracht Oudenaarde’ and changed its name on 7 March 2001 to ‘Tijdelijke Handelsvennootschap Waterkracht Bovenschelde’. The specifications, sent on 26 March 2001, awarded 40 points for the technical, ecological and landscape approach, with ‘particular attention’ to the optimal functioning of the planned fish bypass channel, 40 points for the guaranteed annual energy output, and 20 points for the variable fee per kWh the concession holder would pay into the Renewable Energy Fund. The contract would be concluded with the candidate whose tender, ‘after any negotiations’, was judged the most advantageous. On 12 April 2001 the third criterion was amended: no longer the total fee multiplied by the expected output, but the amount offered per kWh. Both candidates submitted a tender. On 22 June 2001 the evaluation committee ranked the temporary partnership first with 90 out of 100 (30 + 40 + 20) and Ecowatt second with 65 (25 + 30 + 10). On 5 September 2001 the competent Flemish minister awarded the concession to the temporary partnership. Ecowatt requested the reasoned decision and, under the freedom of information rules, its competitor’s tender and the committee’s report. It received the decision, but the report only after an appeal to the Chancellery and Information administration; the competitor’s tender remained confidential. On 19 November 2001 Ecowatt brought an action for annulment. Its first plea: the winning tender did not adequately protect fish migration — according to a 1998 study by the Institute for Forestry and Game Management, the inflow velocity should not exceed 0.5 m/s — and should therefore have been rejected as irregular, or at least scored zero on the entire first criterion. Ecowatt also argued that the Region should have negotiated. The Council of State disagrees. This was a public works concession, for which Article 131 of the Royal Decree of 8 January 1996 permits but does not require negotiation; the specifications spoke of ‘any’ negotiations. The ecological approach, including fish migration protection, was an award criterion, not a regularity requirement; the specifications set no inflow velocity either, as Ecowatt ultimately conceded. Of the 20 points for the ecological approach, the committee had reserved 15 for ‘fish migration (functioning of the bypass channel)’, thereby giving the required particular attention. The winner scored 10 out of 15 there. Even with a zero on that item it would lose 10 points but, with a 25-point lead, still rank first: Ecowatt therefore had no interest in the plea. The second plea, that under Article 47 of the Companies Code a temporary partnership may not use a common name, also fails. The criticism could not be linked to Article 127 of the Royal Decree, which concerns selection on the basis of personal situation and capacity, and Ecowatt did not show concretely how the alleged consequences of requalification as a partnership (social security, registration, VAT) affected the award decision. The third plea, that the decision merely referred to the uncommunicated committee report, confuses the formal duty to state reasons with the notification of those reasons: the decision was formally reasoned, and defects in its notification do not affect its legality. The action is dismissed. Ecowatt bears costs of 173.53 euros; the intervening parties each bear one third of the 375 euros in costs of their intervention.
Why does this matter?
The judgment draws a distinction that recurs in every dispute over quality criteria: what the specifications assess as an award criterion is not a minimum requirement whose non-fulfilment renders a tender irregular. A weak score on fish migration costs points, not participation. Anyone who believes a competitor fails an essential condition must be able to point to that condition in the specifications; an external study citing a 0.5 m/s threshold is not enough if the specifications themselves impose no threshold. The second lesson concerns interest in the plea. The Council does the arithmetic: even if the disputed item is removed entirely, the ranking does not change, and the applicant then gains nothing. That calculation can make a plea inadmissible before the merits are even reached. Third, the Council confirms that a decision fully incorporating the evaluation report is formally reasoned, even if the authority initially refuses to disclose that report. Whether notification was defective is a different question from the legality of the decision. Finally, the timeline speaks volumes: an action from November 2001 was only decided in July 2010. For a concession that may by then have been built and put into operation, an annulment after such a period comes late in any event.
The lesson
For bidders: if you want a competitor excluded, look for a hard regularity requirement in the specifications, not an award criterion on which it scored lower. Before litigating, calculate whether removing or rescoring the disputed item actually reverses the ranking; if not, the plea will fail for lack of interest. Request the evaluation report with every notification, and use freedom of information rights if the authority refuses. In a concession, consider whether your interests are better served by an application for suspension than by an action for annulment alone. For contracting authorities: if you want an aspect to be a genuine minimum requirement — a maximum inflow velocity, a minimum level of fish protection — state it expressly as a requirement in the specifications, with a measurable value. If you only want to reward it, make the weighting visible, as the committee did here with 15 of the 20 points for fish migration. And attach the evaluation report to the notification: it saves a dispute over disclosure.
Ask yourself
As a bidder: is your objection to a competing tender based on an express minimum requirement in the specifications, or on an award criterion? Have you calculated whether your plea, if upheld, would actually reverse the ranking? Have you requested the evaluation report and, if necessary, invoked freedom of information rules? As an authority: have you included aspects you regard as hard requirements (such as a maximum inflow velocity) as measurable minimum requirements in the specifications? Does your notification include the evaluation report referred to in your award decision?
About this database
The Council of State (Raad van State / Conseil d'État) is Belgium's supreme administrative court. In disputes over public procurement — from contract awards to tenderer exclusions — the Council of State is the final arbiter. The rulings in this database are summarised by TenderWolf in plain language, with practical lessons for tenderers and contracting authorities. View all rulings →