Rejection Dutch-speaking chamber

A bin bag with the wrong bottom: Sphere Belgium submitted samples with side gussets instead of a star seal and loses Intradura’s residual waste bag lot

Ruling nr. 254938 · 28 October 2022 · XIIe kamer

The Council of State rejected Sphere Belgium’s extreme urgency application against the award of lot 1 of Intradura’s framework agreement for residual waste bags to Powerpack, because Sphere had, without prior permission, submitted samples with a bottom seam and side gussets while the specifications required ‘identical’ samples with a star seal, so that Intradura could not establish exactly what was being offered and was entitled to reject the bid as substantially irregular; a general statement that delivery would be ‘fully in accordance with the specifications’ and samples sent only after the bids were opened did not change that.

What happened?

In 2022 the intermunicipal association Intradura launched an open procedure for a framework agreement for the supply of residual waste bags and biodegradable organic waste bags, divided into two lots. Lot 1 concerned printed black residual waste bags with a wave-top closure in three sizes, made of polyethylene with at least 80% recycled plastic, at least half of it post-consumer. Price counted for 60 points; product quality, logistics and fraud prevention together for 40. The specifications (ID/UNIZAK/2022/KWI) left little to chance. Point III.1.4 required a leak-proof bottom seal, expressly a ‘star seal’, and ears of 18 cm for the large size and 14 cm for the small size. Point II.7 required tenderers to deliver, by 18 August 2022 at noon, at least eight rolls of samples of each type of bag, ‘identical to the bags to be supplied’ except for the print; exceptions had to be requested in writing and confirmed. Sphere Belgium did just that, but on one point only. On 3 August 2022 it asked whether it could submit samples of the 60-litre bag with 140 mm ears, together with rolls with 180 mm ears to show that its production lines could make that length. Intradura agreed on 9 August, on condition that the bid would cover bags complying with the specifications and that the deviating samples would ‘in no way’ be understood as an amendment of the specifications. When the bids were opened on 18 August, there were two bids for lot 1: Sphere Belgium’s and Powerpack’s. The award report of 7 September 2022 rejected Sphere’s bid as substantially irregular. Its samples had no star seal but a bottom seam with side gussets, and according to Intradura the bags quoted came from a factory in the Netherlands where star-seal bags cannot be produced. The price therefore related to non-compliant bags and the samples were not identical to what had to be supplied, so the bid could not be compared with Powerpack’s. On 15 September 2022 Intradura awarded lot 1 to Powerpack. On 3 October 2022 Sphere sought suspension under the extreme urgency procedure. It pointed out that its bid expressly stated that delivery would be ‘fully in accordance with the specifications’ and that it had ticked ‘star seal’ in annex C. It blamed the deviating samples on its annual shutdown and on the short period of about a month to have custom bags produced, whereas Powerpack, as incumbent, already had the bags in production. The type of bottom seam would moreover make no difference to the tests in the specifications, and on 6 September 2022 it had delivered rolls with a star seal after all. In the alternative, it argued that the star-seal requirement itself was disproportionate under Article 53 of the Law of 17 June 2016, since the European standard NBN EN 13592 also allows other leak-proof types. The Council agreed with none of this. Sphere had requested an exception for the ears, but not for the bottom, and its bid said nothing about that deviation. In its bid, the general statement of compliance was immediately followed by a reference to the exception granted for the ears, and so did not remove the uncertainty about the product offered; the same applied to the ‘star seal’ box in annex C. Intradura could not verify whether the bags offered matched the bags for which certificates had been submitted, and would have had to compare bags with and without a star seal. Whether the samples could technically be tested was, according to the Council, beside the point; nor was it excluded that the type of bottom seal does affect tensile strength and elongation at break and tear resistance. Intradura formally denied Sphere’s claim that it had tested the first samples anyway. The samples of 6 September arrived weeks after the deadline, and a tenderer that felt it had too little time should have said so, as Sphere had done for the ears; Intradura had moreover applied the statutory standard time limit to a contract that was not particularly complex. As to the star seal itself, the Council held that a contracting authority defines its own needs and enjoys broad discretion. The requirement was linked to the subject matter of the contract — reliable leak-proof residual waste bags for residents — and proportionate to that aim. That another type of bottom may also be leak-proof is a question of expediency on which the Council, as judge of legality, does not rule. The Council did not need to examine the objections of inadmissibility. It rejected the application and ordered Sphere to pay the costs: 200 euros in court fees, a 24-euro contribution and a 770-euro procedural indemnity to Intradura; 222 euros of court fees paid in error were refunded.

Why does this matter?

In supply contracts, samples are often treated as an afterthought: surely the real commitment lies in the bid? This judgment says that is not how it works when the specifications expressly require ‘identical’ samples. A set of samples that departs from the specifications creates uncertainty as to what the tenderer is really offering, and that uncertainty is not cured by a general statement of compliance or a ticked box in a technical questionnaire. The case is all the more instructive because Sphere had duly requested and obtained permission for one deviation — the length of the ears. That works against it: a tenderer that knows the exception procedure and uses it for one point can hardly maintain, for another, that the deviation was unimportant or that time was too short. The argument that the deviation was ‘irrelevant to the tests’ also gets little traction. The Council expects the applicant to show that the difference is entirely irrelevant, and finds that Sphere did not do so. Finally, the judgment confirms the line between legality and expediency in technical specifications. The fact that a competing product may be equally leak-proof does not make a precise technical requirement disproportionate within the meaning of Article 53 of the Law of 17 June 2016; opting for a star seal is a policy choice for the contracting authority. In a market with only two bidders, one of them the incumbent supplier, the case also shows how quickly a formal error at the bidding stage can eliminate competition altogether.

The lesson

Tenderers: treat samples as a full part of your bid. If the specifications require ‘identical’ samples, every deviation — however minor technically — carries a risk of substantial irregularity. If you cannot produce compliant samples in time, request a written exception for every deviation before the deadline and mention those deviations expressly in your bid. Do not assume that a general sentence such as ‘delivery will be fully in accordance with the specifications’ neutralises a deviating sample, and do not count on samples sent after the bids are opened still being taken into account. If you think a technical requirement goes too far, ask questions in time or challenge the specifications, and be aware that the argument ‘another product is just as good’ usually remains a question of expediency for the Council of State. Contracting authorities: a clear sample regime with a procedure for written exceptions, as in point II.7 of these specifications, makes your rejection decision robust. Give concrete reasons why a deviating sample prevents assessment or comparison, and grant exceptions only on express conditions, as Intradura did when it allowed the deviating ears without amending the specifications.

Ask yourself

Are all your samples identical to the products you will supply, on every point described in the specifications? Have you requested and obtained a written exception before the deadline for every deviation in your samples? Does your bid expressly mention every difference between samples and the product offered, rather than only a general statement of compliance? Can your production unit actually make the required product, and is that apparent from your bid and certificates? As a contracting authority: do your specifications define what ‘identical’ samples are and how exceptions are requested and granted? As a contracting authority: do you give concrete reasons why a deviating sample makes comparison with the other bids impossible?

About this database

The Council of State (Raad van State / Conseil d'État) is Belgium's supreme administrative court. In disputes over public procurement — from contract awards to tenderer exclusions — the Council of State is the final arbiter. The rulings in this database are summarised by TenderWolf in plain language, with practical lessons for tenderers and contracting authorities. View all rulings →